Bright red asphalt now snakes between tree lines along the expressway stretch. Once complete, the cycle track will link two metro stations and three business parks. Dedicated crossings and bollard-based separation are part of the design. Daily commuters are already testing short sections in the evening.
Cycle Track Between Sectors 44 and 96 Nears Completion
The 6 km corridor will connect residential pockets to corporate hubs.












